Search by keyword: "stepwise target cost function"
Justification method of the equipment replacement term when the period of equipment availability at the enterprise is uncertain
Authors: Dynchenkova T.V. | Published: 06.06.2022 |
Published in issue: #4(69)/2022 | |
DOI: DOI: 10.18698/2541-8009-2022-4-787 | |
Category: Mechanical Engineering and Machine Science | Chapter: Machines, Units and Processes | |
Keywords: replacement period, period of equipment use, initial cost, variable operating costs, residual cost of equipment, dynamics of changes in equipment state, dynamic programming method in reverse time, modeling of equipment replacement process, stepwise target cost function |